e-mail lunthesis@163.com phone 0551-65179860-203

anhui's renewable energy annual newly installed capacity exceeding 10m kws-k8凯发马德里竞技

pub date:2024-01-31 16:24 source:english.anhuinews.com

in 2023, anhui province achieved remarkable results in the development of renewable energy. the annual newly added installed capacity exceeded 10 million kilowatts for the first time, reaching 12.13 million kilowatts, with a growth rate of 87.5%. the cumulative installed capacity reached 48.24 million kilowatts, accounting for 44.6% of the total installed power generation capacity in the whole society, which is the highest proportion in the yangtze river delta region, increasing by 5.4 percentage points compared to 2022. among them, the cumulative installed capacity of wind and photovoltaic power reached nearly 40 million kilowatts, doubling since 2020, and rose by three places in the national ranking compared to the previous year.

according to the responsible person from the new energy department of anhui provincial energy bureau, in recent years, anhui has been promoting the doubling of wind and solar power installations. to address the land constraints for the rapid development of wind and solar power, the province conducted a comprehensive survey of wind and solar power development resources and encouraged localities to incorporate the spatial information of projects into the land and spatial planning according to regulations, guiding the rational layout and accelerating the pre-construction work. in 2023, anhui province added 12.01 million kilowatts of wind and solar power, an increase of 128%.

at the same time, efforts were made to strengthen the whole process management and services including registration, construction, and grid connection to promote the standardized and orderly development of distributed photovoltaic power. in 2023, anhui province added 8.47 million kilowatts of distributed photovoltaic installations, becoming the main driving force for the accelerated development of renewable energy in the province. by the end of 2023, the cumulative installed capacity of distributed photovoltaic power in the province reached 19.37 million kilowatts, a year-on-year increase of 77.7%.

in 2023, anhui province's renewable energy generation reached 62.33 billion kilowatt-hours, a year-on-year increase of 19.9%, an increase of 6.8 percentage points compared to 2022. it accounted for 17.7% of the province's total power generation, an increase of 1.8 percentage points compared to 2022. the cumulative generation of renewable energy in the province indirectly replaced the consumption of approximately 25.51 million tons of coal, equivalent to a reduction of approximately 48.47 million tons of carbon dioxide emissions.


source: anhuinews.com

editor:zheng chen

related news
-    2024-01-31 09:32
-    2024-01-31 09:32
-    2024-01-31 09:32
-    2024-01-31 09:32
 
photo  >>
wuhu, anhui: 100,000 mu of canola flowers blossoming
guest countries of honor attract visitors at 6th ciie
video  >>
【机遇中国 创新安徽】德企精英齐聚安徽看发展:“中国这9年的发展成就不亚于德国90年来取得的成绩”german enterprise elites gather in anhui to explore development:'nine years development in china it's like ninety years in germany.'
【机遇中国 创新安徽】 德国政企考察团点赞合肥:“合肥的科技水平在世界首屈一指!” german government and enterprise inspection team praises hefei: 'hefei is at top level worldwide in technology!'
people  >>
hebei rolls out red carpet for talent
transnational couple revives ancient dwelling in east china
travel  >>
2024看中国安徽行 对话国际青年导演 2024 looking china youth film project anhui
2024看中国安徽行 对话国际青年导演 dialogue with international young directors
contact us
k8凯发马德里竞技 copyright ©2000-2021 anhuinews.com all rights reserved. reproduction in whole or in part without permission is prohibited.
网站地图